Causes and Effects of Cost and Time Overrun

of Road Construction Projects in Gujarat
Buch | Softcover
96 Seiten
2018
Scholars' Press (Verlag)
978-613-8-50129-9 (ISBN)
59,90 inkl. MwSt
  • Titel nicht im Sortiment
  • Artikel merken
A number of road construction projects are increasing from time to time in Gujarat, India. However, completion in predetermined cost and time is difficult. The objective of this book is to identify the factors causing cost and time overrun on road construction project in Gujarat and to give relevant recommendations to the most critical factors. This study is delimited incauses and effects of cost and time overrun of road construction projects in Gujarat. Questionnaire survey was used to collect the data from the contactors, clients and consultants and Relative Importance Index (RII) method adopted for analysis. Form the analysis four and eleven major factors are identified for cost and time overrun causes respectively. Spearman s rank coefficient was adopted to test the agreement to in ranking of the factors.There is a strong correlation in ranking between the Consultant Vs Client (Gov t body) for the factors affecting cost overruns and Contractor Vs Client (Gov t body) for factors affecting time overruns. Findingsof the study will help designers, clients, and contractors to aware and improve of cost and time overrun in road constructions in the future.

Tadewos, Shambel G.
Shambel G. Tadewos - Lecturer in Aksum University, Ethopiya.Dr. Mohammed Shakil Malek - B.E. (Civil Engineering), M.E. (Construction Engineering & Management with Gold Medal), PhD (Civil Engineering). He is working as a Principal in F. D. (Mubin) Institute of Engineering & Technolgy, Gandhinagar, Gujarat, India. Malek, Mohammed Shakil
Dr. Mohammed Shakil Malek - B.E. (Civil Engineering), M.E. (Construction Engineering & Management with Gold Medal), PhD (Civil Engineering). He is working as a Principal in F. D. (Mubin) Institute of Engineering & Technolgy, Gandhinagar, Gujarat, India. Delivered expert lectures and guided number of PG students from various universities.

Erscheinungsdatum
Sprache englisch
Maße 150 x 220 mm
Gewicht 159 g
Themenwelt Wirtschaft
Schlagworte causes • cost overrun • Effects • Gujarat • Time Overrun
ISBN-10 613-8-50129-2 / 6138501292
ISBN-13 978-613-8-50129-9 / 9786138501299
Zustand Neuware
Haben Sie eine Frage zum Produkt?
Wie bewerten Sie den Artikel?
Bitte geben Sie Ihre Bewertung ein:
Bitte geben Sie Daten ein:
Mehr entdecken
aus dem Bereich
Fachwissen zur Vorbereitung auf die IHK-Sachkundeprüfung für die …

von Ulrike Götz

Buch | Softcover (2023)
VVW GmbH (Verlag)
59,00
Fach- und Führungskompetenz für die Assekuranz Geprüfter Fachwirt für …

von Matthias Beenken …

Buch (2021)
VVW GmbH (Verlag)
39,00